婷婷伊人久久大香线蕉av-国产日韩欧美在线综合网-精品亚洲国产成人蜜臀优播av-五月亚洲丁香激情综合

How to keep high production rate of screw pump

Date of issue:[2020-08-17]     Click through rate:    

Screw pump is the most commonly used mechanical oil extraction method in the world, and its most common operation problem is that the pump can not be fully filled, resulting in low productivity. The incomplete filling of pump is due to the pump capacity greater than the well output or the poor gas separation at the pump inlet, and part of the pump displacement is lost due to the interference of gas in the pump and the control of the pump operation time, so as to make the pump displacement and flow Matching the amount of fluid entering the bottom hole can improve the efficiency and reduce the cost. The specific methods to maintain the high production rate of screw pump are as follows:

1. Sound wave liquid level measurement should be carried out to determine the relative depth between the production liquid level and the pump suction inlet. If the liquid level is higher than the pump suction, it is impossible for the well to produce at maximum production. If the gas interference affects the production rate, the liquid level is higher than the pump suction; if the pumping volume is too large to cause low production, the liquid level should be at or near the pump suction.

2. The motor power and indicator data can be obtained simultaneously by using the comprehensive data acquisition system. One of the main uses of indicator diagram is to diagnose how the pump works and to analyze downhole problems. The application of production liquid level measurement combined with indicator diagram can be used to know whether the well is producing at the maximum production rate, whether the liquid column height is higher than the depth of the pump inlet, whether the pump is not fully filled and whether the free gas migrates upward along the casing annulus.

3. Diagnosis of low energy efficiency wells. The diagnosis method is to determine the total efficiency of the pumping system, which only needs to measure the input power of the prime mover, determine the bottom hole production pressure and accurate production test data. Generally, the total efficiency of beam pumping system should be about 50%. If it is lower than this, its performance should be improved. Techniques to improve total efficiency include maintaining high volumetric efficiency (matching pump size with wellbore injection volume, eliminating gas interference, controlling pumping with a pumping controller or timer) and replacing excessive motors.

4. Downhole gas separation. Invalid pump operation is often caused by air interference, which can be diagnosed by acoustic liquid level measurement and indicator diagram. It is best to place the pump suction at the bottom of the fluid into the zone, if placed above, gas separator should be used. If the valve seat nipple is arranged at least 10ft below the bottom of the fluid entry section, effective gas separation can occur in the annulus, and the casing acts as the outer cylinder of the separator. However, the conditions of the well often do not allow the pump to be placed below the fluid entering layer, so downhole gas separator should be considered. The conventional gas separator is composed of fluid entering part (such as perforating nipple), outer cylinder (such as a section of tubing with plug at the bottom) and liquid sealing pipe at the bottom of pump.

5. The displacement of the pump can be controlled by adjusting four parameters: plunger size, stroke length, pump stroke number and daily operation time. Due to the high cost of pumping equipment, the pump with inappropriate size is not usually replaced. The simplest way is to change the configuration of the ground equipment, such as moving the beam rod to change the stroke length of the ground and the pump; the second is to replace the motor pulley to control the pump stroke number. The matching problem of pump volume and well productivity can be realized by changing the daily operation time. The following devices can be used to control the operation time: air pumping controller, interval timer and percentage timer. If the air pump controller detects that the pump is not fully filled, it will stop the pump. The timer controls the running time of the pump, which is cheap and easy to operate. The duration of pump stop should be short to the bottom hole production pressure rise no more than 10% of the reservoir pressure. The operator can measure the above acoustic wave and indicator for each well within 45min to determine the well productivity, downhole pump performance, downhole gas separator performance, sucker rod and beam pumping unit load and motor performance. Through the analysis of 45min, the operator can make the well production maximum and reduce the operation cost.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

午夜看片福利欧美熟女| av一区二区中文字幕| 高清国产国产精品三级国产av| 亚洲欧美国产日韩综合在线| 日本欧美精品一区二区精选| 日韩欧美国产亚洲在线| 国产精品亚洲欧美在线| 亚洲97成人在线视频| 中文字幕人妻出轨一区二区| 日韩成人高清免费在线| 日韩少妇一级淫片免费| 亚洲综合一区二区精品久久| 日本一欧美一欧美一亚洲| 午夜精品国产日韩欧美在线| 99热这里只有精品最新| 神马影院在线观看午夜| 天天操天天干蜜桃av| 爱我久久视频网免费视频| 精品成人18亚洲av播放| 中文字幕av在线有码| 国产极品美女高潮抽搐| 日韩精品欧美中文字幕| 亚洲免费视频区一区二| 一区二区日韩欧美国产| 中文字幕有码av海量| 国产精品一级片免费看| 国产精品精品国产色婷婷| 亚洲第一青青草原在线| 国产精品亚洲欧美日韩在线播放| 乱色精品熟女一区二区三区| 国产亚洲高清国产拍精品| 国产精品久久123区| 婷婷六月开心激情五月| 精品欧美激情精品一区| 国产婷婷色三区一区二区| 二区三区在线欧美日韩| 夜夜春国产精品不卡一区二区| 在线看电影亚洲一区| 免费草b视频在线观看| 亭亭丁香激情五月涩久久| 日韩在线观看精品亚洲|