婷婷伊人久久大香线蕉av-国产日韩欧美在线综合网-精品亚洲国产成人蜜臀优播av-五月亚洲丁香激情综合

Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

在线视频网友自拍偷拍| 久久午夜人妻一区二区| 国产精品一区二区毛卡片| 亚洲一区二区日韩人妻| 色婷婷区二区三区四区| 亚洲香蕉av一区二区蜜桃| 成人黄色三级免费网站| 日韩在线视频不卡播放| 求个手机免费在线观看av网址| 久久精品夜夜夜夜夜久久| 未满18禁止入内在线观看| 亚洲 欧美 日韩一区| 99久久精品人妻少妇一| 精品少妇人妻av不卡久久| 日韩精品电影一二三| 成年人免费在线观看毛片| 日韩成人手机视频在线观看 | 中国人妻一区二区三区| 91麻豆精品国产91久| 99热这里只有精品56| 人妻少妇麻豆中文字幕久久精品| 国产老熟女一区二区三区| 99热在线播放精品观看| 精品一区无遮挡免费网站| 伊人亚洲中文一区二区| 欧美一区二区精品网站| 国产成人av麻豆色哟哟| 国产精品久久久久精品三级下载| 男人天堂av东京热伊人| 国产精品一区二区久久| 国产成人激情自拍视频在线观看| 日本一区二区三区三州免费观看| 亚洲国产在线一区二区| 亚洲精品有码在线观看| 亚洲一区二区三区不卡视频| 国产精品一区二区激情视频| 中文字幕国产精品专区| 日本大胆高清人体艺术| 五月开心婷婷中文字幕| 久久精品亚洲欧美麻豆| 午夜国产激情福利网站|