Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

欧美日韩亚洲中文综合网| 丰满人妻被猛烈进入中文版| av蜜臀一区二区三区| 成人永久免费播放平台| 国产高清剧情在线观看| 91超碰这里只有精品国产| 女同伦理视频在线观看| 久草国产免费福利在线视频| 日本经典三级在线视频| 五月婷婷丁香噜噜噜噜| 国产成人色污在线观看| 国产精品无遮挡猛进猛出| 91国产性感美女视频| 色婷婷亚洲综合色一区二区| 国产伦精品一区二区三区免费视频 | 国产三级黄在线观看| 亚洲av乱码毛片在线播放| 亚洲激情欧美日韩精品| 午夜在线观看视频免费| 在线播放欧美视频91| 91国语对白在线观看| 婷婷色悠悠,色悠悠激情啪啪| 欧美日韩一区二区不卡视频| 最新日韩人妻中文字幕一区| 内射嫩国产欧美国产日韩欧美| 国产亚洲欧美精品在线观看| 91精品国产高清久久福利| 国产av麻豆全部免费| 91精品国产高清91久久久久久| 人妻有码av中文字幕久久| 亚洲一区二区精品欧美日韩| 91久久精品国产一区蜜臀| 亚洲一区在线观看蜜臀| 黄片超刺激在线看在线| 国产精品午夜福利亚洲综合网| 亚洲精品偷拍在线观看| 国产亚洲一区二区三区乱码| 日韩一区二区三级电影| 精品国产乱码一区二区三区| 国内精品一区二区欧美| av久久精品在线观看|