Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

日本不卡一二区不久精品免费| 日韩一卡一卡在线观看| 日本午夜视频在线观看| 日韩免费系列一区二区| 国产精品毛片一区二区三| 国产精品兄妹在线观看91| 男人av天堂手机在线| 日本午夜在线观看视频| 日本国产一区二区三区在线观看| 水牛av影视亚洲精品| 国产91日韩欧美在线观看| 久久五月精品综网中文字幕| 91亚色在线免费观看| 亚洲精品色在线网站国产呦| 夜夜嗨精品免费视频播放| 成人黄色小视频下载| 天天操天天干蜜桃av| 国内精品久久久国产盗摄| 日本精品在线小视频 | 国产日韩精品免费在线| 日本韩国三级伦理在线观看| 国产传媒在线免费播放视频| 四虎精品免费在线视频| 熟女中文字幕亚洲一区二区| 日本成人大片在线观看| 小黄片免费在线播放观看| 亚洲欧美日韩精品二区| 国产精品男人在线播放| 中文字幕国产精品经典三级 | 亚洲熟女乱妇爽到高潮| 老女人性生交大片免费| 欧美黄片网站在线观看| 夫妻性生活视频一级片| 日本一区二区三区免费不卡视频| 九九视频666免费| 青青草青青草在线观看视频| 午夜福利视频在线一区| 91口爆吞精国产对白| 播放欧美日韩特黄大片| 亚洲男人堂色偷偷一区| 国产精品欧美色区福利在线|